Monday 17 September 2007

Tour of New Build

Attended the Building Update Meeting on 13th August. Everything is going to plan for the hand over of the new build on the 14th October. I was then lucky enough to get a tour of the new build, it is going to be amazing. There is so much room, and the outside space around the new classrooms is such an added bonus.
On the 3rd September I was able to go around the new build again and the stairs up to the library area had been installed. The space upstairs is so bright and airy, the view over the field is great, the children are going to be so lucky to have such an amazing library area. The new hall is massive with lots of extra storage, which is great as I'm responsible for keeping PE storage tip top!
Heather Dolman

No comments: